The works comprised of separating the vacant Post Office on the ground floor with the occupied Royal Mail premises. The works involved stripping out and separating the two post offices and forming openings within existing walls to create compliant escape routes within the separate demise and blocking up conjoining doorways to make them 2 separate buildings.