The works include structural alterations in bedrooms, electrical socket and lighting upgrades, and a new alcove socket. The WC cloakroom fitted with a new towel rail, vanity unit, sink, and tap. Strip out existing kitchen in preparation for new units, alongside new service pipework. Flooring replaced with engineered oak, and new radiators installed in the kitchen and hallway. Additional tasks include boiler replacement, loft pipe lagging, fireplace wall boarding, making good Velux windows, carpet refitting, and installation of TV, internet, and bathroom fittings.