Harlow Post Office.

Construction The works comprised of separating the vacant Post Office on the ground floor with the occupied Royal Mail premises. The works involved stripping out and separating the two post offices and forming openings within existing walls to create compliant escape routes within the separate demise and blocking up conjoining

Andridge Court

Construction Andridge Court Andridge Court Wimbledon. We recently undertook the excavation and replacement of a deteriorated and uneven pathway for a block of flats in Wimbledon. The previous pathway had become a safety concern, so we removed it and installed a sleek, durable replacement built for both function and longevity. This

Alexandra School – Beckenham, Outdoor Space Transformation Project

Construction Kent School Outdoor Space Transformation Project This project involved a complete transformation of the outdoor space at a school in Kent, focusing on improving both functionality and aesthetics. The existing grounds were revitalised with the installation of new artificial grass, creating a vibrant and safe play area for the children. Tarmac

Perry Hall Kent, Playground Expansion Project

Construction Perry Hall Playground Expansion Project This project involved the expansion and enhancement of the Perry Hall playgrounds, to improve safety and functionality. Safety barriers were installed, and nearby structures were protected throughout the process. The ground was excavated, and steel girders with weather-treated timber sleepers were installed to form a

St Alfege College with St Peter’s CE Primary School

Construction Libra Construction is proud to announce the successful completion of our latest project in Greenwich - the refurbishment of the orginal windows at St Alfege College. This beautiful School a cornerstone of the community since it's founding in 1849, has been rejuvenated with a vibrant update that preserves it's

Client’s kitchen in Sevenoaks Kent

Construction This project aims to transform the client’s kitchen in Sevenoaks, Kent into a modern, functional, and energy-efficient space. Through meticulous planning, quality craftsmanship, and attention to detail, the new kitchen will not only enhance the aesthetic appeal of the home but also provide an improved culinary experience for the

Kenmal Community & Technology College

Construction A complete overhaul of the existing property with small front extension. Before After

Copeland Road, Peckham

Construction This project involved a complete renovation of staff offices and the canteen area. The upgrades included a new kitchen installation, the addition of a prayer room, and the provision of lockers and a shower room. Accessibility was improved with the inclusion of disabled toilets. Finally, the canteen area and

Shenstone school

Construction Works carried out were for an overhaul of the play area, carpark line marking, classrooms and creating a brand new sensory room. Before After